National Repository of Grey Literature 70 records found  1 - 10nextend  jump to record: Search took 0.00 seconds. 
University dormitory
Glogarová, Tereza ; Stavinohová, Jana (referee) ; Utíkalová, Ivana (advisor)
The new building of a university dormitory with workshops is the content of the presented thesis. The building consists of fifty-two beds for students’ accommodation with complete equipment in eight cells, three workshops and a technical support. This is a combination of reinforced concrete prefabricated skeleton and classical masonry building construction with insulation. The building has four floors. It is designed as seven towers with flat roofs, which protrude from a ground floor with a vegetative roof. Paved and parking areas are adjacent to the building. The project is designed into an urban area of Nový Jičín. Glass atrium and overall shape solution are the distinctive features of the proposal.
Winery
Koláčková, Jana ; Havířová, Zdeňka (referee) ; Lavický, Miloš (advisor)
The diploma thesis deals with project of a new building of winery production. Winery has one floor and a basement. We can split the winery into three parts. First part – production. This whole part is dedicaded to the production of wine. It consists of spaces where grapes are degraded, fermented, pressed, stored, bottled, labeled and subsequently exported. Production has a volume of 300 000 l of wine. Second part is for administration. There are two offices and a confrence room. Third part is for public using and it is composed of the tasting room with view at the wineyard and of the retail hall. The structural system is prefabricated skeleton of reinforced concrete. The roof is constructed as a flat green roof.
Execution of Multifunctional Building in Lužice - Building Construction Project
Mouka, Jiří ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
The diploma thesis deals with the solution of the multi-purpose building project in Lužice. This work includes the extended accompanying and summary technical report, the coordination situation of the construction, the technical report of the transport relations and the coordination of the oversized transport, the object time schedule and the financial plan of the construction, the plan for providing the material resources containing the staff balance for the construction of the main building, the time schedule for the assembly of the prefabricated skeleton, technological standard for prefabricated skeleton, design of main building machines and mechanisms including their time commitment, organization of construction of multipurpose building including drawings of construction site equipment, technological regulation for assembling of prefabricated skeleton and for making of reinforced concrete floor, inspection and testing plan for prefabricated skeleton assembly, lifting mechanism, assembly schemes for prefabricated skeleton elements, lifting mechanism verification schemes, item budget prefabricated skeleton chalk and instructions for building use and maintenance.
Construction-technological project of the extension of the production hall
Mézl, Petr ; Liška, Pavel (referee) ; Novotný, Michal (advisor)
This diploma thesis deals with the construction and technological project of the extension of the production hall Granitol a.s. in Moravian Beroun. The thesis focuses on the technological stage of assembly of the prefabricated skeleton of the rough top structure and the laying of the floor formation. In addition, an extended accompanying and summary technical report, a technical report on transport relations and coordination of oversized transport, a time and financial plan for the construction, a budget for the prefabricated skeleton, a timetable and the balance of the workers, the design of the main construction machines and mechanisms, including their time commitment , organization of the construction of the building including drawings of the construction site equipment, technological regulation for the assembly of the prefabricated skeleton and the laying of the floor formation, inspection and testing plan for the prefabricated skeleton assembly, summary assessment of the lifting mechanism selection, schematic of the assembly procedure of the prefabricated skeleton elements, protection and health at work during construction.
Assembly of Steel Hall in Okřínek
Zdražil, Luboš ; Lukášková, Jana (referee) ; Mohapl, Martin (advisor)
The bachelor thesis describes the realization assembly of steel hall in Okrinek. The part of this stage is assembly off all elements steel hall including trapezoidal sheet metal. The thesis handles with technological prescription, assessment of transport itineraries, itimized budget with statement of quantities, design of site equipment, construction schedule, inventory of machines, control and test plan and occupational safety and health. In the last chapter of the thesis, there is described a fire-resistant coating of steel construction. The annexes consist of blueprints situation, The situation with wider transport relations, blueprints for the site technologies, process of assembly of stell hall, process of assembly of trapezoidal sheet metal and schedule.
Preparation of the implementation of the prefabricated hall of the power plant in Mělník
Vondřejc, Adam ; Rotrekl, Ivo (referee) ; Kantová, Radka (advisor)
The subject of this diploma thesis is the construction technological project of the implementation of the prefabricated hall of the power plant in Melnik. This thesis conatins a technical report, project of the site equipment with technical report, time and financial plan of the building, study for the realization of major technology stages, desingn of assembly machines, budget of object, technological specification of steel structure and cast-in-place constrution of pump pit, also monitoring and test plans.
Construction-Technological Preparation of Warehouse and Administrative Building in Černá za Bory
Štěpánek, Michal ; Hejl, Martin (referee) ; Mohapl, Martin (advisor)
The aim of this diploma thesis is the construction and technological solution of the warehouse and administrative building in Černá za Bory. The diploma thesis contains technological procedures for assembly of reinforced concrete skeleton and realization of industrial floor. This work solves problems that could arise during the assembly of the skeleton and realization of industrial floor. The thesis contains a construction technology project, a study of the implementation of the main technological stages, the situation of the construction with broader relations of transport routes, the project of construction site equipment and the main design of machines and mechanisms. Furthermore, I created a variant solution of skeleton assembly including financial and time evaluation. Since the project documentation that was provided to me did not include any details for the skeleton placement, I decided to develop design details for the skeleton placement. Subsequently, I developed a plan for occupational safety and health. As a part of this work I made a comparison of industrial floors, both in terms of performance and economic. In order to find out the time demands, I prepared an exact timetable for the implementation of the main building. In order to ensure high safety and quality, I prepared a control and testing plan for the assembly of the skeleton and for the implementation of industrial flooring.
Autosalon with car service
Vorlíčková, Petra ; Dohnal, Jakub (referee) ; Fuciman, Ondřej (advisor)
This diploma thesis deals with the design of a new car showroom with a car service. The content is the project documentation for construction work. The new building is located in the cadastral area of Řečkovice on a slightly sloping plot. The building is divided into 2 buildings - car showroom and car service. The showroom features exhibition grounds, office space and technical facilities. In the part of the garage, besides the service workshop, the customer part, staffing facilities and technical background are designed. Both operations can be separated if necessary. The building is shaped like a detached two-storey building with underground garages. The above-ground part of the building is designed as a prefabricated skeleton with filler masonry, underground is made of monolithic reinforced concrete - "white bath" system. It is roofed with a flat roof.
Administrative grounds in Prague - Hostivař, preparation and organization of building construction
Smolková, Pavlína ; Mohapl, Martin (referee) ; Šlanhof, Jiří (advisor)
Final work is processed for an administrative center in Prague. It is the preparation and organization of the construction of the object in Hostivař. The work is done for the most important technological phases of site equipment, economic comparison of cranes, financial and time evaluation of building, selection of main mechanisms and main part of the text dealing with the character of the building, its technical data, process of constructing the object and the overall treatise about building. Technological process is made for the technological phase of construction of assembled skeleton.
Preparation for rough superstructure steel buildings in Uničov
Vondřejc, Adam ; Kolečkářová, Barbara (referee) ; Kantová, Radka (advisor)
The main purpose of the bachelor thesis is to describe technological state of rough upper construction of the steel production hall which is part of the location of the company Melites s.r.o, I will design optimal working procedure for the most effective construction regarding the foundations of the construction. I will focus on different variants of the lifting equipment. Furthermore, I will concentrate on fire prevention systems for steel constructions while applying the knowledge on this particular object. In addition, the thesis includes budget, monitoring and test plan and schedule of work in which I will mention also building envelope of the steel hall.